
Contract signing Ceremony of Ferry 5000 GT
Palembang, October, 22, 2012Contract signing ceremony between Directorate General of Land Transportation (LLASDP) and PT. Dumas Tanjung Perak Shipyard to build 1 (one) unit of Ferry RoRo 5000 GT. The Ferry will be used for connection between Merak (West Java) and Bakauheni (South Sumatra). Construction period is 26 months.
Mr. YanceGunawan, President Director of PT. Dumas Tanjung Perak Shipyard (second from right)
Contract signing ceremony for 1(one)unit Coaster 1200 GT and 1 (one) unit Coaster 200GT
Jakarta, November2, 2012Contract signing ceremony on November 2, 2012 held at Tanjung Priok, Jakarta for 1(one) unit Coaster 1200 GT and 1 (one) unit Coaster 200GT for the Directorate General of Sea Transportation. The contract signing is witnessed by the Indonesian Minister of Transportation, Mr.E.E. Mangindaan (back left)
Mr. YanceGunawan, President Director of PT.DumasTanjung Perak Shipyard (front,right)
Launching of KMP Siginjai
12 March 2011PT Dumas Tanjung Perak Shipyard has successfully launched 1 unit of Ferry RO-RO 500 GT named KMP SIGINJAI (Route: Kuala Tungkal-Tanjung Uban) on 12 March 2011 owned by Departemen Perhubungan Direktorat Jendral Perhubungan Darat Direktorat LLASDP Indonesia. This vessel specification as mention below: LOA: 45,5 m, Breadth Moulded : 12 m. Draft: 2,15 m, Main Engine 2 x 800 HP, Passengers� capacity 202 persons, Vehicles 12 truck 7 sedans
KMP Siginjai at sea
Keel Laying of FERRY 750 GT Kupang Ende
22 July 2011Keel Laying of Ferry 750 GT was done in PT Dumas Tanjung Perak Shipyard on 22 July 2011. This ceremony was attended by the Governor of NTT Mr. Drs. Frans Lebu Raya and all local officials from NTT province. This ship will operate in Kupang - Ende area. The purpose of Dinas Perhubungan NTT province is to enhance economical and accessibility sectors in Flores.
Keel Laying 750 GT Ferry
Launching Ferry KMP Badaleon and Keel Laying of Ferry Ro-Ro 750 GT Kupang-Ende
29 July 2011Ferry Ro-Ro 500 GT Named �KMP Badaleon� made by PT Dumas Tanjung Perak Shipyard has successfully launched on 29 July 2011 along with keel laying ceremony for 2 units of Ferry Ro-Ro 750GT (routes : 1st vessel Maluku-Papua, 2nd vessel NTT) which is has been contracted on July 2011 between Departemen Perhubungan Darat LLASDP and PT Dumas Tanjung Perak Shipyard
Launching of KMP Badaleon
Keel Laying PERTAMINA TANKER 3500 DWT
August 2011August 2011, PT Dumas Tanjung Perak Shipyard celebrated the keel laying of the PERTAMINA Tanker 3500 DWT ship. The keel laying ceremony is a significant milestone in the ship building process when the first block, or section of the ship, is lowered into the building dock. Furthermore, PT PERTAMINA gradually increases their fleet transport for Oil and Gas distribution in the country by building new ship in national shipyard. In addition, this ship is under NK class which is one of the IACS members.
Keel Laying Of 3500 DWT Tanker Pertamina